Case Study: BF01
Location: Hikutaia
Cows: 300 Spring Calving
Brief/Description:
- Existing storage was a blocked off barrier drain which was pumped to a few paddocks via a petrol trash pump.
- Wanted a turnkey solution that ticked all the boxes now and into the future.
Solution:
Given the flat layout of the cowshed, a new line was thrusted into the centre of the yard to gain height. All effluent directed into a manual rainwater diverter before stone trap & 25m3 effluent sump, stone trap cleanings are periodically stored in a sealed tailings bunker.
All effluent transferred to a suitably sized HDPE lined storage pond. Stored effluent then stirred and pumped down the farm when soil conditions suit.
Key Products | |
---|---|
Precast Stone Trap & 25m3 open top effluent sump with Williams child proof fence | |
Williams 3 x 3 x 1.4 metre solids bunker | |
HDPE liner with geotextile underlay, gas venting & ground water drainage/leak detection system by Agruline NZ | |
Williams 4 Drum Pontoon on guides with Yardmaster Transfer Pump & Submersible Mixer | |
Williams 6 Drum Pontoon with Yardmaster pump & stirrer |