Case Study: RT01
Location: Ngatea
Cows: 900 Spring Calving
Brief/Description:
- Existing storage ponds were too small and not sealed to required standard
Solution:
Massey University dairy effluent storage calculator used to accurately determine storage capacity required. Dimensions of pond calculated to reduce earthworks required while remaining above summer ground water table levels.
Pond able to gravity feed back into existing concrete sump to eliminate need for a second pump on pond
Key Products | |
---|---|
HDPE liner with geo textile underlay, gas venting & ground water drainage/leak detection system by Agruline NZ | |
Gravity return system with Williams control valve |